ABSTRACT

Huge amount of hydrocarbon in place is left unrecovered. Integrated reservoir management, in addition to the use of new technologies improves hydrocarbon recovery.

Intelligent completion is one of the technologies which enhance reservoir management thereby improving the hydrocarbon recovery.

This work presents a review of intelligent completion technology, guidelines to evaluate the decision whether or not to implement intelligent completion and evaluates field cases of intelligent completion installation.

The case studies were derived from four fields where intelligent completions have been implemented. Comparison of intelligent completion with non-intelligent completion was based on ease of data acquisition for reservoir management, incremental oil production and profitability criteria.

The yard sticks used for economic analysis include the net present value, discounted payout period, profitability index and growth rate of return.

The results from the study show that reliable intelligent completion improves reservoir management by enabling data acquisition and well monitoring.

Employing intelligent well completions in reservoir management can lead to 21% to 38% increase in oil recovery and 17% to 41% increase in NPV compared to non-intelligent completion.

It must be pointed out that intelligent system failure may render intelligent completion projects economically unattractive.

The results of this study can be used to evaluate the feasibility of executing an intelligent completion project; especially in fields were intelligent completion is yet to be implemented as a tool for reservoir management.

TABLE OF CONTENTS

DEDICATION……………….. iii

ACKNOWLEDGEMENT……………. iv

ABSTRACT……………………. v

TABLE OF CONTENT…………… vi

LIST OF FIGURES……………… ix

LIST OF TABLES……………… xi

CHAPTER 1

INTRODUCTION…………… 1

  • INTRODUCTION…………….. 1
  • STATEMENT OF THE PROBLEM……………….. 3
  • OBJECTIVES OF THE STUDY…………. 4
  • SCOPE OF STUDY…………………… 4
  • ORGANIZATION OF THESIS……………… 5

CHAPTER 2

  • LITERATURE REVIEW……………. 6
  • RESERVOIR MANAGEMENT…………….. 11
  • INTELLIGENT WELL COMPLETION………………… 14
  • CLASSIFICATION OF MONITORING SYSTEMS……….. 17
  • COMPONENTS OF IWC……………… 18
  • APPLICATIONS AND BENEFITS OF IWC…………. 19

CHAPTER 3

METHODOLOGY………… 24

  • INTRODUCTION………….. 24
  • RESERVOIR DATA ACQUISITION AND MANAGEMENT………. 26
  • WELL PERFORMANCE……….. 27
  • TIME VALUE OF MONEY AND ECONOMIC ANALYSIS………….. 32

CHAPTER 4

RESULTS AND DISCUSSION OF CASE STUDIES IN RESERVOIR MANAGEMENT…….. 37

  • INTRODUCTION…………… 37
  • ASSUMPTIONS COMMON TO ALL FOUR CASE STUDIES………. 37
  • CASE STUDY 1: COMMINGLED PRODUCTION FROM A TWO-LAYER OFFSHORE FIELD           38
  • CASE STUDY 2: MULTI-LATERAL PRODUCER-INJECTOR PATTERN OFFSHORE FIELD 45
  • CASE STUDY 3: TRIPLE COMINGLED PRODUCTION – USARI FIELD OFFSHORE NIGERIA………… 52
  • CASE STUDY 4: HORIZONTAL WELL PRODUCTION – OSEBERG FIELD OFFSHORE NORWAY………… 59

CHAPTER 5

CONCLUSIONS AND RECOMMENDATIONS…………… 67

  • SUMMARY AND CONCLUSIONS……………. 67
  • RECOMMENDATIONS…………….. 68

NOMENCLATURE……………. 69

REFERENCES………………. 71

APPENDIX      76

INTRODUCTION

Reserves are the main asset of the exploration and production (E&P) industry. Every E&P firm aims at maximizing its total profit in the long run, hence the industry aims at enhancing ultimate recovery of a field, cost efficiently.

However, most of the hydrocarbons in place are not recovered; about 35% of hydrocarbons in place are recovered leaving behind the remaining 65%.

The need to improve recovery from the huge amount of remaining hydrocarbons in place around the world requires sound reservoir management practices.

Integrated reservoir management is a continuous process and the key to successful operation of the reservoir throughout its entire life. It requires the use of both multi-disciplines and technological resources for maximizing profit.

A comprehensive reservoir management plan involves depletion and development strategies, data acquisition and analyses, geological and numerical model studies, production and reserves forecasts, knowledge of facilities requirement and economic optimization.

These can facilitate better reservoir management which will enhance economic recovery of hydrocarbons (Satter et al., 1994). Intelligent well completion forms part of the overall vision of reservoir management optimization.

REFERENCES

Aggrey G. H. et al.: “Data Richness and Reliability in Smart-Field Management – Is There Value?”, SPE 102867 presented at SPE Annual Technical Conference and Exhibition, San Antonio, Texas, September 24-27,
Ajayi, A. and Konopczynski, M. R.: “Intelligent-Well Technology Reduced Water Production in a Multilateral Oil Producer”, SPE 102982 presented in the SPE Annual Technical Conference and Exhibition, San Antonio, September 24-27
Barreto C. E. A. G. et al.: “Use of Water Cut to Optimize Conventional and Smart Wells”, SPE 150908 presented at the North Africa Technical Conference and Exhibition, Cairo, Egypt, February 20-22,
Behrouz* T., et al.: “Economic Evaluation of Smart Well Technology – A case Study”, presented at the 14th International Oil, Gas & Petrochemical Congress, Iran,
Brock W. R., et al.: “Application of Intelligent-Completion Technology in a Triple-Zone Gravel Packed Commingled Producer”, SPE 101021 presented in the SPE Annual Technical Conference and Exhibition, San Antonio, September 24-27,
Dekui X. et al.: “Smart Well Technology in Daqing Oil Field”, SPE 161891 presented at the Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, UAE, November 11-14,

Be the first to comment

Leave a Reply

Your email address will not be published.


*