This is a satisfactory method in which the refuse is placed in a designated area and covered with a layer of earth. When a level ground is used, sanitary filling is done in trenches 2-3m deep and 3-m deep and 2-10m wide. When naturally occurring depressions, excavations and pits are to be filled up, this can be done by tipping te refuse into them in th e form of alternate layers of refuse and earth. A 30cm layers of earth is adeqauate between two layers of refuse.
Sanitary filling of low lying places is a useful method of reclaiming such land for building, playgrounds, gardens and agricultural farms. The process of sanitary filling is much facilitated by the use of bulldozers. Physical, chemical and bacteriological changes occurring within the buried mass of refuse render it innocuous with 4-6 , months after the decomposition of organic matter is complete. MC. Gupta (20050. landfill is a probably the most common method of domestic waste disposal.
· Basically it consists of four steps, viz:
·
-depositing waste in a planned controlled manner.
· Spreading and compacting it in layers to reduce its volume
Related Posts: PHYSICAL AND HEALTH EDUCATION
Be the first to comment